Projects: our own work, described by what the photos show
These photos come from our own jobs. We describe the technique and what can be seen in each image; we do not add details that the photo does not show.
For our clients' privacy, the location and date of each job are not published. The descriptions are limited to what the photo itself shows.
Hand demolition on a roof
Flat-roof layers broken out with a demolition hammer
Worker using a Bosch demolition hammer to remove a flat-roof surface on a tall building
Roof layers are removed by hand because the roof slab cannot take the weight of a machine and the work is at height. The breaker takes off the finishing tiles and mortar bed strip by strip, which keeps the open area small and lets the rubble be bagged as it comes off.
Technique
Hand demolition with an electric demolition hammer
What the photo shows
A Bosch demolition hammer working on the flat roof of a tall building
Roof strip-out
Team removing flat-roof layers by hand
Three workers with electric breakers removing the layers of a flat roof
Stripping a flat roof down to its slab is a layered job: finishing, bedding, waterproofing and insulation come off in sequence. Working as a team of three lets one person break, one bag and one clear, so the debris never accumulates on the roof.
Technique
Manual removal of roof layers
What the photo shows
Three workers removing flat-roof layers
Before
Single-storey house before demolition
Before: single-storey brick house with tiled roof and porch, green rubble skip on site
This is the starting point of a house demolition: a single-storey brick building with a pitched tiled roof and a covered porch. The skip is positioned before work starts so that material removed by hand from the inside can be loaded straight away.
Technique
Preparation before selective demolition
What the photo shows
Single-storey brick house with tiled roof, porch and a green skip
During
The same house during demolition, materials sorted
During: the same house partly demolished, brick and timber sorted into separate piles
Selective demolition means separating materials as they come off, not afterwards. In this photo the timber from the roof structure and the brick from the walls are already in separate piles, which is what the waste law asks for and what an authorised waste manager expects to receive.
Technique
Selective demolition with on-site sorting
What the photo shows
Brick and timber sorted during demolition of the same house
CAT excavator on brick rubble next to a partly demolished old building and basement walls
Not every job stays manual. Once the interior has been stripped and the building is to be cleared, a machine takes over the heavy rubble. Here an excavator works on brick rubble from an old building while the basement walls remain in place, which is the point where interior work hands over to mechanical demolition.
Technique
Mechanical clearance after demolition
What the photo shows
CAT excavator on brick rubble of an old building, basement walls visible